Student Name
Capella University
PM-FPX 5332 Project Management, Planning, Execution, and Control
Prof. Name
Date
PM FPX 5332 Assessment 1 New Marketing Strategy
Cosmo Inc. can strengthen its competitive position in the wearable technology market by introducing the Tech Lifestyle initiative, a strategic project that combines technology improvements, targeted marketing, market research, and enhanced customer support. The project is designed to increase customer engagement, attract new buyers, and expand the company’s market presence through a coordinated marketing and technology strategy. With a proposed budget of $150,000, a 10-week preparation period, and a six-month marketing campaign, the initiative establishes a structured approach to achieving measurable business growth.
The PM FPX 5332 Assessment 1 project scope statement outlines the objectives, deliverables, budget, timeline, responsibilities, dependencies, assumptions, and approval requirements associated with the Tech Lifestyle initiative. It also explains how marketing, information technology (IT), finance, and customer service will collaborate to prepare and implement the proposed strategy.
Executive Summary of the Tech Lifestyle Project
Cosmo Inc. is an established technology company with business interests in lifestyle solutions, fitness, and nutrition education. The organization currently holds an estimated 33% share of its target technology market. However, growing competition from emerging technology businesses has created pressure to strengthen its marketing approach, improve existing technology offerings, and attract new customer segments.
Under the leadership of CEO and President Harold Living, Cosmo Inc. plans to introduce Tech Lifestyle as a strategic initiative that combines its existing technology capabilities with a focused marketing campaign. The project will emphasize the practical benefits of wearable technology, improved customer engagement, and stronger connections between technology and everyday lifestyle needs.
PM FPX 5332 Assessment 1 New Marketing Strategy
The initiative has an allocated budget of $150,000 and a 10-week preparation period, followed by a planned six-month marketing campaign. Its business case identifies several growth targets, including a 20% increase in a selected business performance measure and a 15% expansion of the customer base within targeted demographic groups.
The project will involve collaboration among marketing, IT, finance, and customer service departments. Each department will contribute specialized expertise, coordinate activities, and provide progress updates to ensure that the initiative remains aligned with its approved objectives.
The scope statement establishes the boundaries of the project and provides a common reference for stakeholders. According to the original project documentation, the scope statement takes precedence in the event of a conflict with the project charter, subject to the organization’s formal governance and approval procedures.
Business Objectives of the Tech Lifestyle Marketing Strategy
The primary business objective of the Tech Lifestyle project is to improve Cosmo Inc.’s competitive position through technology enhancements and targeted marketing. The initiative aims to increase brand awareness, strengthen customer relationships, and encourage greater adoption of wearable technology products.
The project will combine market research, technology evaluation, campaign development, and customer service preparation. These activities will help the organization understand customer expectations, identify opportunities for improvement, and communicate the value of its products more effectively.
Product Description and Proposed Solution
The Tech Lifestyle initiative will use existing technology and targeted marketing activities to improve awareness and adoption of Cosmo Inc.’s lifestyle-oriented technology products.
The proposed solution focuses on evaluating existing products, identifying opportunities for technology improvements, and developing a marketing campaign that communicates relevant customer benefits. Rather than introducing unrelated business activities, the project will build on the organization’s existing capabilities and explore how they can better serve customers interested in wearable devices and digital lifestyle solutions.
Before implementation, the IT department will assess the technical feasibility of proposed enhancements. Marketing will use research findings to develop appropriate messaging, while customer service will prepare the resources needed to assist customers after launch.
This coordinated approach is intended to ensure that the marketing campaign accurately represents product capabilities and that the organization is prepared to support increased customer interest.
Target Market and Customer Demographics
Identifying the right target market is essential to the success of the Tech Lifestyle marketing strategy. The project initially identifies technology-oriented consumers who are interested in wearable devices, fitness-related technology, and digital lifestyle solutions.
The original project description identifies adults between 25 and 50 years old as a primary marketing audience. Another business objective highlights college-educated consumers aged 20–25 with annual incomes exceeding $75,000. Because these demographic groups overlap only partially, the marketing team should reconcile the audience definitions before finalizing the campaign.
The intended customers are individuals who regularly use mobile applications, cloud-based services, and digital technology in their personal and professional lives. Geographic targeting will initially emphasize cities with populations exceeding 500,000, depending on the findings of demographic research.
Market research should determine which customer segments demonstrate the strongest interest in wearable technology. Surveys, customer satisfaction ratings, purchasing patterns, and engagement data can help Cosmo Inc. make evidence-based decisions rather than relying exclusively on assumptions about age, education, income, or location.
Market Share and Business Growth Targets
Cosmo Inc. aims to increase its estimated market share from 33% to at least 44%. This represents an improvement of 11 percentage points and reflects the company’s intention to strengthen its position against competitors.
The initiative also identifies a 20% increase in a selected business performance measure and a 15% expansion of the customer base within targeted demographic groups.
These figures should be treated as project targets rather than guaranteed results. To evaluate progress accurately, management must define the specific metric associated with the 20% increase, establish baseline performance, and determine the appropriate measurement period.
The marketing team should monitor customer acquisition, conversion rates, engagement, customer satisfaction, and market share throughout the campaign. Reviewing these indicators will help management determine whether the strategy is producing the intended results.
PM FPX 5332 Assessment 1 New Marketing Strategy
The project scope defines the work required to research, prepare, coordinate, and launch the Tech Lifestyle initiative. It establishes which activities are included in the project, which responsibilities belong to each department, and how deliverables will be evaluated.
A clearly defined scope helps prevent misunderstandings, reduces unnecessary changes, and keeps project activities aligned with the organization’s business objectives.
Work Included in the Project
The approved project scope includes market research, technology assessment, marketing strategy development, departmental coordination, financial monitoring, implementation preparation, and customer service readiness.
These activities will be completed through collaboration among the participating departments. Each team will be responsible for producing specific deliverables while coordinating with other departments when tasks depend on shared information or resources.
Market Research and Technology Assessment
The IT department will review available organizational data, investigate customer demographics, and evaluate how existing technology can support the proposed improvements.
The assessment will identify technical requirements, compatibility issues, integration dependencies, and opportunities to enhance existing products. These findings will help determine whether the proposed technology changes can be completed within the approved budget and schedule.
The marketing department will conduct audience research and develop campaign messaging based on customer needs and product capabilities. The initial demographic assumptions will be reviewed against research findings before the final audience is selected.
Research results should be documented and shared with relevant stakeholders so that product decisions, marketing priorities, and implementation requirements are based on consistent information.
Reporting and Cross-Departmental Collaboration
The project will establish a reporting structure that allows marketing, IT, finance, and customer service to share information and monitor progress.
Each department will contribute information related to its responsibilities. For example, customer service can provide customer satisfaction ratings and recurring complaint trends, helping marketing understand which product features and service improvements matter most to users.
The finance department will monitor expenditures against the approved budget. IT will report technical progress and integration concerns, while marketing will provide updates on demographic research and campaign preparation.
Customer service will communicate staffing, training, and support requirements. The project manager will consolidate these reports, identify issues requiring attention, and communicate important decisions to the project sponsor.
Technology Implementation and Launch Preparation
Technology implementation and launch preparation will require coordination across all participating departments.
The IT team will assess technical requirements, coordinate integration activities, and verify that the proposed solution meets established acceptance criteria. Marketing will prepare campaign materials, while finance will review spending and resource requirements.
Customer service will develop the information and training resources needed to assist customers after launch.
Before implementation, the project team should confirm that technical testing is complete, significant defects have been resolved, marketing materials accurately represent product capabilities, and customer support resources are available.
The project manager will coordinate these activities and report implementation readiness to the project sponsor.
Work Excluded From the Project
Any additional products, major technology developments, or services that are not included in the approved deliverables should be treated as potential scope changes.
The original scope statement does not provide detailed procedures for every implementation activity. These requirements should be clarified during project planning as technical and operational needs become more specific.
Proposed additions should be documented and evaluated before work begins. This will help prevent scope creep, unnecessary expenses, and delays caused by activities that were not included in the original project plan.
Project Dependencies
Project dependencies are activities, resources, or external conditions that must be available for the initiative to progress successfully. Understanding these relationships allows the project manager to identify potential delays and coordinate work more effectively.
External Project Dependencies
The Tech Lifestyle project depends partly on information and conditions outside the immediate control of the project team.
Demographic research is one important external dependency. The reliability of survey responses, participant selection, and sample size can affect the accuracy of customer insights. If research participants do not adequately represent the intended market, the resulting marketing strategy may not reach the most promising customers.
Customer demand is another external dependency. Even a well-planned campaign may generate limited results if the technology does not meet customer expectations or offer a meaningful advantage over competing products.
Market conditions, competitor activities, and external technology requirements may also influence project outcomes. The team should monitor these factors and recommend adjustments when supported by reliable information and appropriate authorization.
Internal Project Dependencies
Internal dependencies involve communication, resource availability, financial approvals, and coordination among participating departments.
Marketing depends on IT for accurate product information and confirmation of technical capabilities. IT may depend on finance for spending approvals and on other departments for requirements and implementation priorities.
Customer service depends on timely product information, training materials, and clear support procedures to prepare employees for customer inquiries.
Regular meetings, documented decisions, clear task ownership, and timely reporting will help manage these dependencies. The project manager should monitor cross-departmental activities to identify problems before they affect major milestones.
Project Assumptions
The Tech Lifestyle project is based on several assumptions that should be reviewed and validated during implementation.
First, demographic research is expected to provide reliable information about customer interests and purchasing behavior. Second, the proposed technology enhancements are assumed to be technically feasible within the approved financial and scheduling constraints.
Third, the marketing campaign is expected to generate sufficient interest to support the desired customer acquisition and market growth objectives. The project also assumes that marketing, IT, finance, and customer service will provide the personnel, information, and resources necessary to complete their assigned activities.
These assumptions should be documented in the project plan. If new information shows that an assumption is incorrect, the project manager should evaluate its effect on project scope, cost, schedule, and expected business benefits.
Project Constraints
Project constraints are limitations that affect how activities can be planned and completed. The main constraints identified for Tech Lifestyle involve the approved budget, implementation schedule, and technology integration requirements.
Budget Constraint
The project has an approved budget of $150,000. All planned activities, including market research, technology assessment, marketing preparation, testing, and customer service readiness, must be managed within this financial allocation.
The finance department will monitor actual expenditures, forecast remaining costs, and identify potential budget overruns.
Any request to increase the approved budget must be documented and reviewed through the organization’s formal change approval process.
Schedule Constraint
The project includes a 10-week preparation period followed by a planned six-month marketing campaign.
The preparation schedule must accommodate market research, strategy development, budgeting, technology assessment, testing, stakeholder reviews, and launch readiness.
Delays in technical integration, financial approvals, or cross-departmental decisions could affect the intended launch date. The project manager should monitor dependencies, review milestone completion, and resolve scheduling conflicts before they become major problems.
Technology Integration Constraint
Integrating proposed improvements with existing technology may require additional testing, technical adjustments, or coordination between departments.
Compatibility problems, system limitations, and unexpected development requirements could increase project costs or delay implementation.
To manage these challenges, the IT department should identify integration risks early, document technical requirements, and conduct appropriate testing before approving the solution for launch.
Project Milestones and Schedule Management
A project milestone schedule provides a structured overview of important activities and expected completion dates. It helps the project manager monitor progress, coordinate departmental responsibilities, and identify tasks that may delay implementation.
The original Tech Lifestyle project documentation identifies the following milestone dates. These dates are retained as supplied historical planning information and should not be interpreted as verified completion dates.
| Project milestone | Target date |
|---|---|
| Project start | October 19, 2021 |
| Strategy development | October 20, 2021 |
| Timeline, reporting, and data analysis | October 22, 2021 |
| Finance and budget review | October 24, 2021 |
| Development, ideas, marketing, and IT coordination | October 27, 2021 |
| Initial implementation draft review | November 1, 2021 |
| Review and implementation readiness | December 8, 2021 |
| Final review | December 20, 2021 |
| Project completion and implementation | December 31, 2021 |
Gantt Chart and Schedule Monitoring
A Gantt chart can help visualize the activities, milestones, dependencies, and deadlines associated with the Tech Lifestyle project.
The chart should identify which activities can take place simultaneously and which must be completed before other tasks begin. For example, marketing campaign development depends on accurate demographic research and verified product information from IT.
The project manager should review the schedule regularly, compare actual progress with planned milestones, and document approved changes. Delays affecting major dependencies should be communicated promptly to department directors and the project sponsor.
One scheduling issue requires clarification: the original milestone dates extend from October 19 through December 31, 2021, which does not clearly demonstrate the stated 10-week preparation period followed by a six-month campaign. The project manager should reconcile the detailed milestones with the intended project duration before approving the final schedule baseline.
Project Approach and Management Strategy
A structured project management approach will help Cosmo Inc. coordinate its departments, manage changes, maintain quality, and control project resources.
Change Management
Change management will help employees understand and adapt to the operational and technological changes introduced through Tech Lifestyle.
Department directors will provide regular updates about completed activities, emerging concerns, and resource requirements. The project manager will coordinate these updates, document decisions, and ensure that approved changes are communicated to relevant stakeholders.
Any proposed change affecting project scope, budget, schedule, or deliverables should undergo formal review. The project team should assess the potential benefits, costs, risks, and effects on other activities before approving additional work.
This process will help prevent uncontrolled scope expansion and protect the project’s original priorities.
Communication Management
Effective communication is essential for maintaining coordination among marketing, IT, finance, and customer service.
The original plan calls for meetings every two weeks during the first two weeks, followed by weekly meetings. This meeting frequency should be clarified during project initiation to ensure that it is practical and consistently applied.
Project meetings should focus on completed tasks, upcoming milestones, financial performance, technical concerns, risks, and decisions requiring stakeholder attention.
Meeting notes should document important decisions, assigned responsibilities, and action deadlines. Additional meetings may be scheduled when urgent technical, budget, or scheduling issues require immediate attention.
Quality Management
Quality management will ensure that the technology and related services meet the project’s requirements before launch.
The IT department should evaluate system functionality, compatibility, reliability, security, and performance according to the project’s technical requirements. Testing results should be documented, and identified defects should be assigned for correction.
Significant technical problems must be resolved and retested before the affected functionality is approved for release.
Marketing materials should also undergo quality reviews to confirm that product descriptions and promotional claims accurately reflect verified capabilities. Customer service should receive appropriate training and product information before the campaign begins.
Resource Management
Department directors will manage resources within their respective teams and assign qualified employees to project activities.
The project manager will coordinate resource requirements across departments and identify conflicts that may affect delivery.
Resource planning should consider staff availability, technical expertise, testing requirements, marketing deadlines, and customer service preparation. If a department lacks sufficient capacity to complete its responsibilities, the issue should be communicated early so that management can consider alternative arrangements.
Critical Success Factors for the Tech Lifestyle Project
The success of the Tech Lifestyle initiative will depend on clear objectives, reliable market research, effective communication, coordinated implementation, and disciplined financial management.
All stakeholders must understand their responsibilities and receive accurate updates about project performance. Market research must provide useful information about the intended audience, while technology assessments must confirm that proposed improvements are feasible.
Other important success factors include realistic scheduling, early risk identification, adequate technical testing, customer service readiness, and continuous campaign monitoring.
The project team should establish measurable key performance indicators (KPIs) before implementation begins. These may include:
- Customer acquisition and customer base growth.
- Marketing engagement and conversion rates.
- Customer satisfaction and retention.
- Product adoption and usage.
- Market share and competitive positioning.
- Budget performance and schedule adherence.
- Technology readiness and implementation quality.
Clear definitions and baseline measurements will help management determine whether the initiative is delivering its intended business benefits.
Risk Management for the Tech Lifestyle Initiative
Risk management is an essential part of the project because unexpected problems can affect marketing performance, technology implementation, financial resources, and delivery timelines.
The project manager should maintain a risk register that identifies potential problems, evaluates their likelihood and impact, assigns responsible owners, and documents response strategies.
Market Research and Demographic Risks
Unreliable survey responses or inaccurate customer assumptions could lead to ineffective audience targeting. The marketing department should use appropriate research methods, review the quality of collected information, and validate demographic findings before finalizing the campaign.
Technology Integration Risks
Technical incompatibility, system limitations, and unexpected development requirements could delay implementation.
The IT department should perform early technical assessments, document integration dependencies, and conduct testing before launch. Technical concerns should be communicated promptly to the project manager.
Budget and Schedule Risks
Unexpected expenses, staff shortages, and delayed departmental decisions could threaten the project’s approved constraints.
Finance should monitor spending and forecast future costs, while the project manager should track milestone completion, dependencies, and schedule variances. Contingency planning can help the team respond to unexpected challenges.
Communication and Coordination Risks
Poor communication between departments may result in duplicated work, missed deadlines, and inconsistent information.
Regular meetings, clear task ownership, documented decisions, and timely issue escalation can reduce these risks and improve accountability.
Customer Adoption Risks
The marketing campaign may not achieve the anticipated increase in customer engagement or market share.
The marketing team should monitor customer responses, evaluate campaign performance, review feedback, and recommend adjustments based on measurable results.
Project Organization and Roles and Responsibilities
The Tech Lifestyle project will use a cross-functional management structure involving executive leadership, project management, marketing, finance, IT, and customer service.
Each participant will contribute specific expertise and remain responsible for assigned activities. Clear role definitions will help prevent confusion and ensure that important decisions are handled by the appropriate individuals.
| Project role | Assigned individual | Primary responsibilities |
|---|---|---|
| Project sponsor | Harold Living | Establish objectives, provide executive direction, and approve major project decisions |
| Project manager | Naureen Durrani | Coordinate activities, monitor progress, manage communication, and report to the sponsor |
| Marketing director | Elon Musk | Lead demographic research, surveys, campaign planning, and marketing execution |
| Chief financial officer | Jeff Bezos | Monitor expenditures, review financial performance, and manage budget oversight |
| IT director | John Apple | Coordinate technical assessments, integration, and implementation activities |
| Customer service director | Tom Hiddleston | Prepare support resources, coordinate employee readiness, and oversee customer service preparation |
The contact numbers included in the original project material appear to be placeholders. They should be replaced with verified business contact details before the project documentation is distributed.
Project Authorization and Approval Requirements
Formal authorization ensures that the project has appropriate management support and that stakeholders understand the approved scope, budget, schedule, and responsibilities.
Project Scope Statement Approval
The project scope statement requires approval from Harold Living, the project sponsor, and Naureen Durrani, the project manager.
Their approval confirms that the document accurately represents the project’s purpose, objectives, deliverables, boundaries, assumptions, constraints, and management requirements.
Department leaders should also review the scope statement to confirm that their teams understand the work assigned to them.
Project Baseline Changes
Changes to approved project baselines must be reviewed and authorized by Harold Living and Naureen Durrani, according to the original project plan.
Any proposed modification affecting scope, cost, schedule, or major deliverables should include a documented justification and an assessment of its expected impact.
Once approved, changes should be communicated to affected stakeholders and reflected in the relevant project planning documents.
Deliverable Approval and Acceptance
The project sponsor will provide overall project approval, while representatives from marketing, finance, IT, and customer service will review deliverables related to their respective responsibilities.
Each deliverable should meet the agreed requirements and acceptance criteria before it is approved. Technical implementation, marketing materials, budget reports, and customer service preparation should undergo appropriate reviews before the project is considered ready for completion.
Project Scope Statement Approval Details
Project name: Tech Lifestyle
Project manager: Naureen Durrani
The scope statement serves as the official reference for coordinating project activities, evaluating proposed changes, monitoring performance, and determining whether the initiative has achieved its agreed objectives.
Approval indicates that designated stakeholders understand and accept the project’s purpose, boundaries, deliverables, and management requirements.
Work Breakdown Structure (WBS) for the Tech Lifestyle Project
A Work Breakdown Structure (WBS) divides a project into smaller, manageable work packages. It helps project managers organize activities, assign responsibilities, estimate resources, and monitor progress.
The original Tech Lifestyle project structure identifies three major workstreams that will coordinate activities across the participating departments.
Workstream 1: Strategy, Budget, and IT Management
The first workstream focuses on strategic planning, financial coordination, technical assessment, and project reporting.
The team will review market research, evaluate technology requirements, establish budget controls, and monitor performance against the approved schedule.
Major outputs include the project strategy, budget documentation, technology requirements, progress reports, and implementation recommendations.
Workstream 2: Risk Assessment and Problem Resolution
The second workstream focuses on identifying and addressing risks that could affect project performance.
The team will evaluate market uncertainty, technical dependencies, resource limitations, communication challenges, and potential scheduling problems.
Risks should be recorded in a formal risk register that includes assigned owners, proposed response strategies, and review dates. Significant issues should be escalated to the project manager and sponsor when they exceed the authority of individual teams.
Workstream 3: Results Sharing, Implementation, and Launch
The third workstream brings together marketing, finance, IT, and customer service to prepare the project for implementation and launch.
Marketing will coordinate promotional activities and customer messaging. Finance will monitor spending and budget performance. IT will oversee technical readiness and testing, while customer service will prepare employees and support resources.
The project manager will coordinate the workstreams, verify that dependencies are addressed, and confirm that all required deliverables have been reviewed before implementation.
Conclusion
The Tech Lifestyle initiative provides Cosmo Inc. with an opportunity to strengthen its position in the wearable technology market through targeted marketing, technology improvements, and coordinated customer support. With a proposed budget of $150,000, a 10-week preparation period, and a six-month marketing campaign, the project establishes a structured approach to improving customer engagement and achieving business growth.
Successful implementation will require effective collaboration among marketing, IT, finance, and customer service. Each department must understand its responsibilities, communicate progress, manage risks, and deliver work according to the approved project scope.
The project also requires careful attention to demographic research, technology integration, resource availability, budget management, and schedule coordination. Establishing clear performance indicators will allow management to evaluate customer acquisition, campaign effectiveness, market share, and overall project performance.
By maintaining clear project boundaries, applying formal change control, and using measurable outcomes to guide decisions, Cosmo Inc. can improve its ability to execute the Tech Lifestyle strategy and pursue sustainable growth in the competitive wearable technology market.
Frequently Asked Questions (FAQs)
1. What is PM FPX 5332 Assessment 1 about?
PM FPX 5332 Assessment 1 focuses on developing a project scope statement for Cosmo Inc.’s Tech Lifestyle initiative. It covers the project’s business objectives, deliverables, budget, schedule, target market, dependencies, assumptions, constraints, risks, responsibilities, and approval requirements.
2. What is the main objective of the Tech Lifestyle project?
The main objective is to strengthen Cosmo Inc.’s competitive position in the wearable technology market through technology improvements, targeted marketing, and enhanced customer support. The initiative also aims to increase customer acquisition, engagement, and market share.
3. What is the proposed budget for the Tech Lifestyle project?
The proposed project budget is $150,000. All project activities, including market research, technology assessment, marketing preparation, testing, and customer service readiness, must be managed within this allocation unless an authorized budget change is approved.
4. How long will the Tech Lifestyle project take?
The project includes a 10-week preparation period followed by a planned six-month marketing campaign. The original milestone schedule requires reconciliation to ensure that its dates accurately reflect the intended project duration.
5. Who is responsible for managing the Tech Lifestyle project?
Naureen Durrani is identified as the project manager. Her responsibilities include coordinating departmental activities, monitoring progress, managing communication, tracking project performance, and reporting to project sponsor Harold Living.
6. What are the major deliverables of the Tech Lifestyle project?
The major deliverables include demographic research, market analysis, technology assessments, marketing campaign planning, financial reports, implementation coordination, technical testing, customer service preparation, and launch readiness.
7. Why is market research important for Cosmo Inc.’s marketing strategy?
Market research helps the company understand customer preferences, identify promising demographic groups, and evaluate demand for wearable technology. Reliable research supports better marketing decisions and reduces the risk of targeting the wrong audience.
8. What is the purpose of a Work Breakdown Structure in project management?
A Work Breakdown Structure organizes project activities into smaller work packages. It helps define responsibilities, identify deliverables, estimate resource requirements, and monitor progress throughout the project.
9. What are the main risks associated with the Tech Lifestyle initiative?
The main risks include unreliable demographic information, uncertain customer demand, technology integration problems, budget overruns, schedule delays, resource shortages, and poor communication between departments.
10. How will Cosmo Inc. measure the success of the Tech Lifestyle marketing strategy?
The company should evaluate customer acquisition, conversion rates, campaign engagement, customer satisfaction, product adoption, and market share. It should also monitor project budget performance, schedule adherence, and technology readiness.
11. Why is formal change control important for the Tech Lifestyle project?
Formal change control ensures that proposed modifications to project scope, budget, schedule, and deliverables are evaluated and approved before implementation. This helps prevent scope creep, unnecessary spending, and delays.
12. How can cross-functional collaboration improve project performance?
Cross-functional collaboration allows marketing, IT, finance, and customer service to share expertise and coordinate responsibilities. Better communication can reduce misunderstandings, improve decision-making, and ensure that the technology and marketing strategy are ready for launch.
References
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK® guide) (6th ed.). Project Management Institute. https://www.pmi.org/pmbok-guide-standards/foundational/pmbok
Project Management Institute. (n.d.). What is project management? https://www.pmi.org/about/what-is-project-management